An SNI Certificate and SPPT SNI are often treated as the same document. Under the draft they have different functions, holders and validity periods. Explor.
Companies that budget only for the initial assessment may overlook the ongoing cost of maintaining product certification. Explore requirements and document.
Sample-unit requirements should be calculated before sample production, including units retained as archived specimens. Explore requirements and documents.
The number of car-battery samples is not based solely on model count. The draft uses different capacity bands for Type 1 versus Types 2 and 3. Explore requ.
Certification samples cannot always be drawn from months-old warehouse stock. Electrolyte state and manufacturing date are relevant to sample eligibility.
Factories may have IEC test reports, but not all reports replace fresh SNI testing. Test coverage and issue dates require review. Explore requirements and.
Foreign manufacturers often have reports from laboratories in their home country. Acceptance is not determined solely by the presence of an accreditation l.
In-house testing capability supports process control and production consistency. It is distinct from the external conformity-assessment laboratory used for.
A battery factory audit is not limited to reviewing ISO certificates. The draft includes minimum manufacturing facilities that must exist and be used. Expl.
A manufacturer with two production facilities may ask whether one head-office certificate covers both. Separate factory locations from administrative or tr.