Factories may have IEC test reports, but not all reports replace fresh SNI testing. Test coverage and issue dates require review. Explore requirements and.
Foreign manufacturers often have reports from laboratories in their home country. Acceptance is not determined solely by the presence of an accreditation l.
In-house testing capability supports process control and production consistency. It is distinct from the external conformity-assessment laboratory used for.
A battery factory audit is not limited to reviewing ISO certificates. The draft includes minimum manufacturing facilities that must exist and be used. Expl.
A manufacturer with two production facilities may ask whether one head-office certificate covers both. Separate factory locations from administrative or tr.
A factory may produce its own battery brand and customer-owned brands at the same site. Not every brand can automatically be listed on a single SNI certifi.
OEM and ODM are common export-industry terms describing production and design arrangements. The draft SNI framework instead uses legal concepts of trademar.
A supply contract with a battery manufacturer and a distribution agreement involving a vehicle brand owner are different instruments. This distinction matt.
Vehicle assemblers may import batteries as manufacturing components. The draft treats this activity separately from importing replacement batteries for res.
The replacement-battery market frequently involves independent battery brands sold through distributors and shops. That structure is different from distrib.